PROCESS

log house building process

TIMELINe

STEP 1

BUILDING MATERIALS PREPARATORY WORK

Forest plot at least 100 years old is selected.

A permit is obtained to fell the forest during the winter.

Selected trees are felled

Timber is transported to a sawmill

STEP 1

STEP 2

HOUSE BUILDING WORK IN A SAWMILL

Machining

The logs are impregnated immediately after processing, otherwise the impregnation would not work. The logs are stored for about 6-8 months.

The logs are taken to the sawmill

The house is built according to the project

The foundations and sewerage are installed.

The house is prepared for transport to its delivery site

Truck picks up the material

STEP 2

STEP 3

CONSTRUCTION WORK ON THE SITE

The house is being assembled 

The roof, windows and doors are put in place

Electricity is being installed

Sewage and heating being installed

Flooring is being laid

The last details are sanded

The house is painted

STEP 3

STEP 4

HOUSE ON RELEASE

Friends

Barbecue

Music

Balloons 

STEP 4

F.A.Q.

The price of the house depends on the square footage of the log walls. The price of a 100 m2 house can vary depending on how many square metres of timber are needed to build a log house. In this example case, the price of a 100 m2 house could be between €17000 and €23000. The price may still vary depending on the number of internal rafter partitions and the height of the ceiling.

This is just an example and it is a fairly large house. Perhaps you need a smaller property that can be built on a smaller budget.

The price includes:

External log walls
Internal log walls
Overlays
Vaults
Roof
Balcony and Terrace construction

No, assembly is not included. This service is not very expensive. The price depends on where the parcel is located.

The cost of assembly in Lithuania for a 100 m2 house is between 2500 and 3500 €, while abroad, depending on the country, it is between 4000 and 6000 €.

A log house will last at least 100 years.

A 100 m2 house usually fits into one truck.